.................................. Return to Sumner's Home Page....
Return to N Scale RR Main Menu........... Return to Building UP's Canyon Division Menu
=========================================
...............Previous Page.............................Next Page If There Is One
=========================================
..........--- Track Surface Part 3 and 110 volt Outlets ---
============================================
Track Surface continued.......
.
.
.
.
.
.
.
.
.
At this point the layout surface has been built on the top of the framework and temporarily screwed to it to keep both it and the framework square. Next up I'll add 3 inch risers to the framework and move the layout up on top of the risers. The risers can be place about anywhere so I'll place them where they won't interfere with servo switch machines under the track surface. If needed in the future any of the risers can be move if they prove to be in the way. If the layout was directly on the frame work there is a chance that the framework might be where I need to place a switch machine or something else under the layout.
======== 110 Outlets Added ==================
Got tired of dragging extension cords all around the layout as I was building the framework and track surface and had some wire left over from building the house years ago so decided to put it to use.
Bought some outlet boxes and covers and installed outlets at each of the uprights and the one finished end.
Will add more to the last section when it is done. This should come in real handy when using other tools down the road.
I also got to use …..
the creeper I made. Worked great running the wiring up inside the framework. Started on my hands and knees and then remembered I had the creeper and switched to it, much better. You can see more about it ( HERE ).
To be continued.....
=========================================
...........................On..............e.........Next Page If There Is One