.................................. Return to Sumner's Home Page....
Return to N Scale RR Main Menu........... Return to Building UP's Canyon Division Menu
=========================================
...............Previous Page.............................Next Page If There Is One
=========================================
…...……..........--- Coal Mine Scenery – Pt. 2 ---=======================================
Continuing on with the scenery for the upper level above the coal mine scene.
.
.
.
Above the work in the area of the tunnel on this side has been continued from where I left off quite a few months ago. The scenery that is directly above the tunnel, where the weight is sitting, will life off for access to the tracks there. There will also be a reach-in from the side to deal with minor problems like a derailment.
.
All of the upper level scenery above will be removable. This will help in accessing tracks for cleaning or maintenance. There will still be windows on the side, like the area where the text is above, for quick access if there is a derailment. Also I’ll be able to Spackle and paint them on the workbench instead of leaning into/over the layout.
All of the caprock is now in place and formed.
.
.
Next I’ll add some terrain detail to the upper level by the bridge abutment. Then will either Spackle and paint or might move onto the next area that will get foam terrain, the other side of the backdrop shown above. I still have that area to do and also a long area where the main yard, engine facilities and some industries are located. I’d like to get all of that in if possible while I still can as this is a lot of physical work and I’d like to put it behind me although I have enjoyed it.
A link to this whole build ( HERE ).
=========================================
...........................On..............eNext Page If There Is One.........