.................................. Return to Sumner's Home Page....
Return to N Scale RR Main Menu........... Return to Building UP's Canyon Division Menu
=========================================
...............Previous Page.............................Next Page If There Is One
=========================================
…..............................................................--- Retaining Walls ---
=========================================
Needed two retaining walls to use at one end of the coal mine's maintenance building so went to work with Fusion 360 ….........
.
.
Love Fusion 360 and feel very lucky that they let us non-commercial people use it free.
.
.
I won't glue the walls to the building until they are painted and the building is painted and weathered. There are also chutes and other buildings that are over the track that haven't been attached yet to the main complex that are printed but not painted and weather yet. I'll leave the maintenance building to the left and the main complex to the right above separate to get to the tracks easier if needed. They fit well together without gluing them and both lift off easily.
The retaining walls were printed with an AnyCubic M3 but I could of printed them with the Ender 3 which was used for the buildings and roofs. At this point I'll take a day or two off from the foam work and work on designing and printing some very low and short bridges to be used where creeks and dry washes go under the tracks in this area of the layout by the mine and on the nearby mainline.
A link to this whole build ( HERE ).
=========================================
...........................On..............e.........Next Page If There Is One