.................................. Return to Sumner's Home Page....
Return to N Scale RR Main Menu........... Return to Building UP's Canyon Division Menu
=========================================
...............Previous Page.............................Next Page If There Is One
=========================================
….............................--- Track Elevator Roadbed and More ---
============================================
Before moving on to laying more track decided to get the roadbed down on the elevator. Also going to get it down to and from the elevator on the lower level and maybe all of the upper level. Before I get much track down on the lower level I really should get the upper level done or near to it as I'll be working over the lower level a lot doing that.
Above and in the next three images the cork as been laid down on the elevator and the lower level three approaches to the elevator.
.
.
I'll extend the approaches a little further on this side and will also get the roadbed down on the 'run-around' track. Then move to the upper level's roadbed.
Moved onto gluing down the upper foamboard on this side of the layout.
.
.
.
.
A link to this whole build ( HERE ).
=========================================
...........................On..............e.........Next Page If There Is One