… …...........................................................--- Fascia – Pt. 2 ---
============================================
Well got half the 60 feet of fascia done in one day and thought I could finish up in a second day but....
…. after about 3 hours and only 3 pieces up stopped for the day. I wasn't sick but no energy.
Worked on some other stuff and a couple days later went back to it and found my energy was up again and ….
.
….. finished up the woodworking part of the fascia.
So far I've been happy with the material selection and the construction side of this. For anyone looking at building a layout I would strongly recommend raising the the layout 3 inches above the main benchwork with risers as explained ( HERE ). They make changes to anything that needs to be done now or later very easy. For example putting a switch machine in and having part of the benchwork in the way is not going to be a problem now or ever.
I've used MinWax stains and urethane's a lot on the two sailboats and for furniture and storage units around the house and have good luck with them so used them again for the fascia.
.
.
Finally time to lay cork and track but also need to get wiring in so I can test the track as I lay it.
If you came into the build here you can find the main index for the build ( HERE ).
=========================================