.................................. Return to Sumner's Home Page....
Return to N Scale RR Main Menu........... Return to Building UP's Canyon Division Menu
=========================================
...............Previous Page.............................Next Page If There Is One
=========================================
… ….................…--- Upper Level East End Part 2 ---
============================================
Moving the upper level into place and connecting it to the upper level on the rest of the layout.
.
.
.
.
.
.
Using the risers, as explained ( HERE ) has worked out really well and makes it easy to make support changes as needed to either level.
In the image above the plywood span will come out later. There will be a high bridge/trestle in that area. The two main line tracks going in opposite directions on the bridge will come out of a tunnel to the right on the left side of the backdrop/divider there. At the other end of the bridge one track will go into a tunnel at the backdrop/divider that will be constructed there and the other line will swing away to the right and enter a tunnel there. This will be a narrower scene where the upper and lower bridges are between the two backdrops, When one looks past it they will see the coal mine complex with tracks coming and going to it from the far side of the layout.
.
To be continued ...........
If you came into the build here you can find the main index for the build ( HERE ).
=========================================
...........................On..............e.........Next Page If There Is One