..................................
Return
to Sumner's Home Page....
Return
to N Scale RR Main Menu...........
Return
to Building UP's Canyon Division Menu
=========================================
...............Previous
Page.............................Next
Page If There Is One
=========================================
…
….................…---
Elevator Approaches Part 2 ---
============================================
This
page will be about how one approach is built. The others are the same
or at least similar in design.
All
the track on the layout will be laid on 1 inch foam board. I really
liked using it on my test layout. A good surface to glue the cork
roadbed to and I can cut some shallow scenery features into it
easily. I did want the final few inches of the elevator approaches
and the elevator itself to not be covered with foam. The reason
being, I'll make the final section of track to the elevator and on
the elevator sections of track that I'll modify so that I can screw
them down and be able to adjust them to some degree if needed for
alignment now and in the future by loosening the screws and adjusting
the track section slightly.
.
.
.
.
.
.
.
.
To
be continued ...........
If
you came into the build here you can find the main index for the
build ( HERE
).
=========================================
...........................On..............e.........Next
Page If There Is One