.................................. Return to Sumner's Home Page....
Return to N Scale RR Main Menu........... Return to Building UP's Canyon Division Menu
=========================================
...............Previous Page.............................Next Page If There Is One
=========================================
… …......................…--- Upper Level Part 1 ---
============================================
Time to move on to the upper level roadbed. I have the elevator set up to raise the train 10 ¼ inches. I'm setting the upper level to the same and it will basically be flat at that level with canyon/mountain type scenery. I considered having it climb a little higher so that it could go over itself once but decided against that. I'm still trying to make this a simpler layout than I might of attempted 10-15 years ago when I was still in my early 60's but that isn't the case. Also there will be a number of turnouts and a few sidings on the upper level. I didn't want the turnouts on a 2 percent grade and wanted to be able to park a train and/or cars at any location and not have to worry about them rolling one way or the other.
.
.
.
.
.
.
.
.
.
To be continued ...........
If you came into the build here you can find the main index for the build ( HERE ).
=========================================
...........................On..............e.........Next Page If There Is One